A 1,500 MW Southeastern U.S. coal-fired power plant was able to improve the effectiveness of their fly ash evacuation systems and reduce the costs of operation and maintenance by an expected 50% through improved, integrated instrumentation. ...
Read the White Paper"We now have a more flexible system that we are expecting to reduce our operation and maintenance costs by 50%. "
Plant Engineer
Southern Utility
Back to Top